FDC Constructions Installation Job

Date Posted:28 October 2022 

FDC Constructions job

MHA Products recently supplied and installed a range of lift tables at FDC Constructions.

FDC Constructions specialise on delivering best in class construction, fit out, refurbishment and building services, and have been doing so for over 30 years. MHA Products began this project from a concept drawing, and were able to transform it to a complete installation!

MHA have an in-house engineering department and graphic designer that was able to design these pit mounted scissor lift tables specially for FDC constructions. MHA began the project by graphically designing these lift tables according to FDC’s requirements and the project was taken all the way to the final steps of installation to complete the project.  Our in-house engineering department is able to design any custom products for any application or industry.

 

MHA has a huge range of standard products however we also specialize in custom solutions. MHA has successfully designed and manufactured, installed and delivered thousands of products to assist in manual handling solutions. MHA has in house full time engineers and designers which can take your problem and turn it into a solution that benefits your employees and workplace.


As mentioned above, MHA has recently successfully completed 150 pit mounted scissor lift tables for FDC Constructions which included the complete design of the concrete pits and electrical cabling conduits to the design of the 1.25 tonne capacity scissor lift tables. To add to this, MHA are happy to be able to say that our professional installation team completed the project far ahead of schedule!


Leave a comment

Comments have to be approved before showing up